Web-based Project Tracking and Critical Path Evaluating System

Main Article Content

Nanida Sroidokson

Abstract

The contral objective of this study was to study users’ problems and requirements, develop,
and study the satisfaction of users toward Web-based Project Tracking and Critical
Path Evaluating System. The data were collected from 4 specialists in the area of project
management and software development. Most of them could not achieve as planned due
to lack of tracking tool. Therefore, Critical Path Method was applied to Web-based Project
Tracking and Critical Path Evaluating System at planning stage for setting up timeframe
of the project. The experimental stage was tested by 10 other specialists by using
interviews and satisfactory surveys. The satisfaction of users was evaluated by averages
() and standard deviation (S.D.) of scores including the in-depth interviews of users.
The research findings showed that the satisfaction of user toward the system on Function
Requirement Test was (= 4.22, S.D. = 0.85), Function Test was (= 4.25, S.D. = 0.84),
Usability Test was (= 4.38, S.D. = 0.76) and Security Test (= 4.37, S.D. = 0.88), all of
which were at very satisfied. The result showed that the system was able to respond to the
needs of users and to meet the requirements of the study.

Article Details

How to Cite
[1]
N. Sroidokson, “Web-based Project Tracking and Critical Path Evaluating System”, RMUTI Journal, vol. 9, no. 2, pp. 35–49, Sep. 2016.
Section
บทความวิจัย (Research article)

References

Chrzan, K. and Michaud, J. (2004). Response Scales for Customer Satisfaction Research. Quirk’s Marketing Research Media. Access (3 October 2013). Available (https://www.quirks.com/articles/a2004/20041004.aspx)

Dong-Eun Lee, J. J. Shi. (2004). Statistical Analyses for Simulating Schedule Networks.Winter Simulation Conference (WSC’04). Vol. 2. pp. 225-231

Jiradamkerng, W. (2009). Project Management. Pathumthani : Wankawee Publisher

Liangpanit, S. (2003). The Development of Project Management with CPM and PERT Support System on Internet. M.Sc. (Information Technology) King Mongkut’s Institute of Technology North Bangkok

Marasovic, J. and Marasovic, T. (2006). CPM/PERT Project Planning Methods as E-Learning Optional Support. International Conference on Software in Telecommunications and Computer Networks. pp. 352-356

Mishra, R. C. (2011). Modern Project Management (2thed.). India : New Age International

Panjaisri, P. and Khemawoot, P. (2004). The Evaluation and Monitoring on Work Procedures of Employees using the Project Management on the Internet. IE Network Conference 2004. Chiang Mai, Thailand

Sappakitkamjorn, J. (2006). Using Exel for PERT/CMP in Project Management. The Journal of Applied Science. Vol. 5. No. 1. pp. 114-121

Varaphakdi, M. (2003). Project Management with PERT and CPM. Bangkok : Chulalongkorn University